Hello dear customers and partners of VictoryCons! In June 2025, the Regal Residence Luxury construction site continues to be accelerated with many key construction items being deployed in parallel.

This is an important stage, laying the foundation for the underground structure. VictoryCons is focusing maximum resources to ensure quality and progress for each stage.

1. Digging the basement

Basement excavation work continues to be carried out layer by layer, ensuring the correct design elevation. Specialized machinery and human resources are arranged reasonably, flexibly coordinating between excavation and transporting soil out of the construction site, ensuring safety and not affecting the surrounding area.

2. Monitoring

In parallel with the construction process below, the geotechnical monitoring system operates continuously to monitor soil displacement, pile settlement, groundwater levels and impacts on neighboring structures. Monitoring data is periodically updated and reported to relevant parties, contributing to the control of safety and stability of the structure throughout the foundation construction process.

3. Construction of steel, construction materials, concrete

The steel fabrication, erection and concrete pouring items are deployed in the foundation area, foundation beams and basement structures. Construction materials are strictly quality controlled from the warehousing stage to the construction stage. The technical team directly supervises to ensure the correct type, design and construction according to standards.

4. Pile head chiseling

The pile head chiseling is carried out immediately after the completion of the bored pile drilling. The construction process ensures high precision, creating favorable conditions for the upper foundation connection stage, while not affecting the quality of the previously constructed pile body.

5. Construction of layer 3 shoring system

VictoryCons continues to construct the basement shoring system layer 3 to stabilize the excavation wall and reduce the load on the soil layers above. This is a stage that requires high technology, close coordination between the supervising engineer and the construction unit to ensure the safety and sustainability of the entire underground part of the project.

6. Labor safety & Environmental hygiene

Work safety is always the top priority at the Regal Residence Luxury construction site. Personal protective measures, signs, barriers and morning meetings are strictly maintained every day. In parallel, environmental sanitation and construction waste collection are carried out regularly, keeping the construction site clean and ensuring urban aesthetics.

With close coordination between the technical, supervisory and construction teams, VictoryCons is committed to continuing to accelerate progress, ensuring the highest quality for each item at Regal Residence Luxury – a project that symbolizes modern and classy lifestyle. We sincerely thank our customers and partners for always trusting and accompanying VictoryCons!

Tin tức khác

VictoryCons accompanies Sports Festival 2025 – Phase 2

After the success of phase 1, Sports Festival 2025 officially returns with phase 2 from October 12 to November 30,...

VICTORYCONS WISHES VIETNAMESE WOMEN’S DAY OCTOBER 20

October 20th – Vietnamese Women’s Day is a special occasion to send gratitude and congratulations to Vietnamese women in general,...

VICTORYCONS ORGANIZES PERIODIC HEALTH CHECK-UPS FOR EMPLOYEES

With the motto “People are the most valuable asset”, VictoryCons always considers taking care of the health and life of...

TEAM BUILDING VICTORYCONS 2025 – OVERCOMING THE WAVES TOGETHER

Recently, VictoryCons organized the Team Building 2025 program with the theme “Overcoming the waves together” at Yen Village Tourist Area...

VictoryCons was honored in the Top 10 Best Design – Construction Contractors in Vietnam 2025 – Breakthrough with a series of trillion-dollar contracts

Within the framework of the Vietnam Excellence Brand 2025 Announcement Ceremony, organized by the Institute for Enterprise Quality Assessment and...