Are you looking for the cost of building a 300m2 factory to prepare for a production, warehouse or business plan? Understanding each cost item is an important step to ensure the project is effective and optimizes the budget. Below is a detailed price list for building a 300m2 factory for a complete factory, helping you easily plan and choose a suitable contractor like VictoryCons .
>>>> SEE MORE: How much does it cost to construct a complete factory ?
[this-toc]
1. Quotation for construction cost of 300m2 factory
To build a solid factory, optimize functionality and save costs, it is necessary to refer to the detailed price list. Below is the quote for the total cost of building a 300m2 factory :
| Category | Estimated cost (VND/m²) | Total cost for 300m² (VND) |
| Factory design (architecture, structure, MEP) | 50.000 – 100.000 | 15 – 30 million |
| Reinforced concrete foundation and base | 200.000 – 400.000 | 60 – 120 million |
| Prefabricated steel frame | 700.000 – 1.200.000 | 210 – 360 million |
| Roofing, insulation wall | 300.000 – 500.000 | 90 – 150 million |
| Doors, windows (aluminum glass, corrugated iron, steel…) | 150.000 – 300.000 | 45 – 90 million |
| Basic electrical and water systems | 200.000 – 400.000 | 60 – 120 million |
| Ventilation system, industrial fan | 100.000 – 300.000 | 30 – 90 million |
| Paint, roof insulation, interior decoration | 100.000 – 250.000 | 30 – 75 million |
| Basic fire protection system (if any) | 200.000 – 400.000 | 60 – 120 million |
Factory construction quotation for 300m²
The total cost of building a factory for 300m² ranges from 1.2 to 1.5 billion VND, depending on the design and materials used. This price includes all necessary items such as steel frame, electricity and water system, fire protection, insulation and basic interior. The estimated construction time is about 35 – 45 days, ensuring the progress of production activities. The steel structure is warranted for 3 – 5 years, bringing peace of mind to the investor.
2. Factors affecting the price of building a 300m2 factory
When planning to build a 300m2 factory , understanding the factors that affect costs is essential to accurately budget. Below are 6 main factors that affect factory construction costs, clearly presented to help you easily estimate your budget when working with a professional factory construction contractor :
- Construction area: Construction area determines the scale and total cost of the factory. With an area of 300m², the factory is large enough to meet the production needs of many businesses. However, if the area changes according to the purpose of use, the cost will also change accordingly.
- Infrastructure: Infrastructure includes electricity, water, drainage and roads. The quality of infrastructure affects the durability and usability of the factory, which in turn affects the construction cost.
- Construction materials: The type of material used, such as reinforced concrete, prefabricated steel or tempered glass, will affect the cost. Each type of material has different prices and characteristics, so choosing the right material is an important factor in controlling the budget.
- Factory location: The location of the building affects transportation and delivery costs. A factory in a convenient location will reduce logistics costs, while a remote location or poorly developed infrastructure can increase overall costs.
- Construction costs: Construction costs include machinery, labor, and project management costs. Choosing a reputable contractor with competitive prices will help optimize construction costs while still ensuring project quality.
- Facilities and equipment inside the factory: Fully equipped with facilities such as lighting systems, air conditioning, and production machinery will improve operational efficiency but also increase initial investment costs. Therefore, it is necessary to carefully consider the necessary facilities to balance the budget appropriately.

3. Criteria for evaluating quality 300m2 factory
Compared to a 100m2 factory , the construction of a 300m2 factory requires higher standards in structure, lighting and technical systems to meet the needs of production and long-term operation. To ensure quality and efficiency during construction and use, a 300m2 factory must fully meet the following criteria:
- Roof slope and roof opening: Roof slope is a key factor to ensure drainage and durability for the factory. For corrugated iron roofs, the ideal slope is from 15% – 20% to help limit rainwater accumulation. Meanwhile, tile roofs require a larger slope (50% – 60%) to maximize the shielding effect.
- Foundation load: The 300m2 factory floor must meet TCVN 2737:1995 standard, requiring the ground surface to be higher than the foundation surface and the foundation must be solid to ensure long-term durability.
- Factory lighting: The factory door system should not be higher than 2.4m and should be made of corrugated iron to optimize natural light. Additional lighting should be provided to ensure adequate lighting throughout the production process.
- Factory ventilation system: Make the most of the natural ventilation system and combine it with air ducts to create a well-ventilated space, reduce humidity and keep the working environment well-ventilated.
- Office standards: The office area must be completely separate from the warehouse area, ensuring quiet and comfort for employees to work.
- Fire prevention and fighting standards: The factory must have a complete fire prevention and fighting system (PCCC) and be periodically maintained to ensure safety for the entire project.
- Construction design drawings: Construction design drawings are an important factor in helping to visualize the overall construction, thereby providing installation instructions and determining detailed work. These drawings help detect flaws during the construction process.
- Site survey: Before construction, a site survey must be conducted to determine the appropriate land area. This ensures that the factory is built in a convenient location, close to the source of raw materials and easy to transport goods.
- Building Permit: A building permit is required by Vietnamese law before starting factory construction. Failure to obtain a permit may result in construction being suspended and the building being demolished upon completion.

4. Construction process of 300m2 factory
Compliance with a methodical construction process helps ensure that the factory project is of high quality, on schedule and at optimal cost. This process can also be flexibly applied to other areas such as a 200m2 factory or expanded to a 1000m2 factory , helping investors easily control the entire construction process:
- Step 1: Survey and study requirements: Before construction, the engineering team conducts a survey of the current status of the land and clarifies the usage requirements from the investor. Clearly defining the purpose of use helps propose a suitable construction plan in terms of area, function and structural solutions.
- Step 2: Prefabricated factory design: Based on the survey results, architects and engineers develop a preliminary design. After agreeing on the overall plan, detailed drawings will be made including architecture, structure, MEP and other auxiliary systems. The design is checked and approved before construction.
- Step 3: Construction preparation: This stage includes applying for a factory construction permit, making a construction plan and arranging human resources, materials and equipment for the project. At the same time, the construction site is cleared, leveled and prepared to be ready for construction.
- Step 4: Factory construction: The construction process is carried out sequentially, starting with the construction of the foundation and floor, followed by the installation of the prefabricated steel frame. Next is the construction of the roof, walls, doors, windows and electrical, water and ventilation systems. Finally, the interior finishing step and heat and waterproofing treatment.
- Step 5: Inspection and acceptance: After completing all items, the project is thoroughly inspected for quality and safety. The technical team and the investor will conduct an acceptance test before handover. If there are any items that are not up to standard, the contractor will repair and complete them to ensure the factory is ready for use.

5. Professional and reputable 300m2 factory construction unit
When looking for a reputable and professional 300m2 factory construction unit , VictoryCons is the top choice, especially in the field of prefabricated factory construction. Below are VictoryCons’ strengths related to factory construction:
- Long-term experience: VictoryCons owns a team of skilled engineers and workers with more than 10 years of experience in the construction industry, especially factory construction. The company has completed hundreds of factory projects from 100m² to 1000m², ensuring the quality of the project always meets standards.
- Cost and progress optimization solutions: The company is committed to providing cost-saving and cost-optimized construction solutions to customers while still ensuring quality. With a scientific construction process, progress is always guaranteed, helping to minimize interruptions in production activities.
- Synchronous design and construction: Here we provide a complete service from design to factory construction, helping customers have a synchronous, quality project from design ideas to actual construction. The design and construction team works closely and synchronously, ensuring that all technical and functional requirements are met.
- Using high-quality materials: The materials chosen by the company for the factory construction such as prefabricated steel, corrugated iron, and concrete all meet high standards and are durable over time. This helps the completed factories to be durable and resistant to harsh weather factors.
- Long-term warranty service: VictoryCons commits to a project warranty of up to 5 years, ensuring peace of mind for investors. During the entire usage process, the company’s maintenance team is ready to support and quickly fix any problems that arise.
- Legal support and construction permits: The construction unit will support customers in completing legal procedures and factory construction permits, ensuring that the project is carried out in accordance with legal regulations and without legal risks.

With its outstanding strengths, VictoryCons is always the ideal choice for investors looking for a reputable and quality 300m2 factory construction unit . The company is committed to providing projects that not only meet standards but also exceed customers’ expectations for a comfortable, safe and sustainable production space.

Với hơn 15 năm kinh nghiệm trong quản lý và triển khai các dự án xây dựng quy mô lớn, ông đã từng đảm nhận nhiều vị trí lãnh đạo chủ chốt như Trưởng Ban Quản lý Dự án, Giám đốc Điều hành, và Phó Tổng Giám đốc Phát triển Dự án tại Tập đoàn Đất Xanh. Kể từ khi gia nhập VictoryCons, Ông đã có những đóng góp xuất sắc và mang tính chiến lược để giúp công ty đạt được nhiều thành tựu vượt bậc.
VictoryCons accompanies Sports Festival 2025 – Phase 2
VICTORYCONS WISHES VIETNAMESE WOMEN’S DAY OCTOBER 20
VICTORYCONS ORGANIZES PERIODIC HEALTH CHECK-UPS FOR EMPLOYEES
TEAM BUILDING VICTORYCONS 2025 – OVERCOMING THE WAVES TOGETHER

